Car Charging Infrastructure Grid-Grade Standard

High-capacity load system 11kW - 120kW requires a strict 3-phase wiring process. EVsafe provides the solution charging station operation absolute safety, eliminating fire and explosion risk to your property.

IEC 61851 standard
EVN legal paperwork

electric car charging station

Design capacity
Up to 120kW DC
Connector
CCS2 / Type 2
Optimize CAPEX / ROI

Choose Configuration By parking duration

Don't “burn money” installing an expensive DC station where customers park overnight. See the EVsafe charging station solutions designed as a “tailor-made fit” for each cash flow.

Park > 4 hours

Overnight Charging (AC)

Suitable for residents coming home or employees at work. Prioritizes the number of charging ports over speed. Low capital investment, easy payback.

View charging station solutions for apartment buildings

11 - 22 kW Type 2 Connector

Park 1 - 2 Hours

Fast Charging (DC)

Customers go for coffee, shopping, or dining. Add amenities to “attract” affluent EV-driving customers.

See the charging station solution for F&B stores

30 - 60 kW CCS2
High performance (High Performance)

Rest stop / Taxi depot (Supercharge)

Requires a massive charging current to turn vehicles around within 15-30 minutes. Suitable for highway rest stops or Green Taxi staging lots.

60-120+
kW Power
Requires a dedicated transformer

DC station consultation

Cash Flow & Operation

Financial Transparency Down to Every Last Digit

Automated accounting system (Auto-Accounting). See details cost & deployment model to choose the best depreciation option.

1. Input (Cost)

EVsafe supports installing a separate 3-phase meter. The investor pays the bill directly to the power company (EVN/NPC/SPC).

No intermediary

2. Selling price (Revenue)

You have full authority to decide the charging price (VNĐ/kWh). EVsafe provides a tool to suggest prices by peak/off-peak hours.

Flexible pricing

3. Reconciliation (Profit)

Customers pay via App. The system reconciles automatically (T+15 or T+30). Money goes straight to your bank account.

Automatic payment

Real-time Management Dashboard

  • View revenue in real time.
  • Alerts for station faults / loss of connection.
  • Export tax reports automatically.
Revenue (Today)
+12.5%
2,450,000 ₫
Now
Risk warning

Weak electrical infrastructure Is the “death sentence” of the project

Electric cars draw an extremely large current continuously for many hours. Connecting to an ill-prepared residential system is “suicidal” for your property. See details on safety & responsibility standards that EVsafe applies.

Underground Cable Fire

When charging >4 hours, under-rated wiring overheats, melts the insulation, and causes short-circuit fires from inside the wall/ground.

Vehicle Refuses to Charge

High-end vehicles (VinFast, Audi, Porsche) will automatically cut off if they detect grounding > 10 Ohm or unstable current.

EVsafe Engineering

  • Grounding resistance
    R < 4Ω
  • Leakage protection device

    RCD Type B

  • Cabinet enclosure protection rating

    IP65 / IK10

  • As-built dossier

    Full Single-line

Download the schematic drawing (Single-line)

* Reference material for electrical engineers

The “3 NOs” Principle

When EVsafe REFUSE INSTALLATION?

  • 1. Insufficient source power capacity

    The transformer station is already at full load or the source wiring cross-section is too small. We decline the connection to avoid a Blackout across your entire building.

  • 2. Serious fire-safety violation

    The parking basement is too enclosed, lacks escape routes, or the automatic fire-suppression system is broken. EVsafe absolutely will not trade lives for revenue.

  • 3. Requesting technical “shortcuts”

    The customer wants to skip the dedicated protective electrical cabinet (MCCB/RCD) or use household wiring to save costs. We respectfully decline service.

Safety is number 1. Revenue is number 2.

I commit to technical compliance

30-Day Roadmap

Deployment Process Industrial Standard

No shortcuts. No skipping steps. See details the charging station deployment process from survey to money landing in your account.

01

Survey & ROI

Measure spare load at the main cabinet. Build a detailed cash-flow spreadsheet & payback time.

02

EVN Legal

Apply for a 3-phase connection permit. Install a commercial meter or a transformer station (if needed).

03

Infrastructure construction

Lay underground cables, install a protective electrical cabinet, erect charging posts. Electrical safety acceptance (measure RCD, grounding).

04

Go-Live & Revenue

Connect the App. Hand over the Admin account. The station starts operating and generating cash flow.

Start step 1 now

* Committed to a 30-working-day schedule

Deployment standard

Deployment Model EVsafe standard

We apply a synchronized design standard set (Modular Design). Ensuring aesthetics and technical safety. See more in the library actual deployment models.

Apartment building car-charging model
AC Slow Charging

Apartment / Apartment building configuration

Optimize the building's power grid. A resident whitelist management system to prevent strangers from charging for free.

See details

Rest-stop charging model
DC Supercharge

Rest-stop station configuration

Dedicated transformer infrastructure 400kVA+. High-capacity 120kW+ charging for long-distance vehicles needing fast turnaround.

Register for DC consultation

Office charging model
Mixed AC/DC

Shopping mall / Office configuration

A hybrid model. Combining fast charging for passing customers (Shopper) and slow charging for staff.

See details

Q & A

Decoding Every Doubt

The most frequently asked questions from investors before committing money.

01. How do I collect charging payments from customers? Do I need to hire staff?

No staff needed. The system operates fully automatically (Unmanned). Customers scan the QR to pay, money goes to the App wallet. The system automatically reconciles revenue on the 15th & 30th of each month. See details EVsafe charging station operation model to clearly understand the cash flow.

02. I don't have 3-phase power yet; does EVsafe help apply for a power supply?

Yes. This is the most important step. EVsafe's legal team will, on behalf of the owner, prepare the technical dossier and single-line drawings to work with the power company (EVN) to apply for a commercial meter. Learn more about the charging station cost & deployment model.

03. EV battery fires are very hard to extinguish; is installing a station safe for the building?

The EVsafe charging station acts as a “smart fuse.” It cuts power immediately (<0.1s) when it detects leakage current or overheating to prevent electrical fire risk. We put operational safety & responsibility above profit.

04. Which vehicle types can the station charge?

We use international connection standards: Type 2 (for AC charging) and CCS2 (for DC charging). Compatible with 99% of EV models in Vietnam such as VinFast (VF3, VF5, e34, VF8, VF9), Hyundai Ioniq 5, Mercedes EQ, Porsche Taycan, Audi e-tron…

Do you have other questions about a specific site?