EV Charging Post
Industrial Standard
Don't gamble your assets on a household outlet.
EVsafe deploys standardized AC charging system:
high load capacity, multi-layer protection, and process-based operational monitoring.
ro)
Installation + acceptance per
checklist
Safety warning
Where It Goes Wrong
Fire Breaks Out There
A charging station is high-capacity electrical infrastructure (10 times an air conditioner).
Most of the risk lies not in the “charger”, but in faulty construction +
no thermal monitoring.
Too
wire load
Using household wiring for continuous charging current melts the sheathing, causing smoldering short-circuit fires inside the wall
(Hotspot).
Lack of grounding & Electrical leakage
Current leaking to the vehicle body/post endangers lives. The system does not auto cut-off (RCBO) when an incident
occurs.
No thermal monitoring
Loose joints generate heat over time but no one notices → accumulating into a fire
hazard.
System alert
128°C
Overheat alert
Detected a connection point exceeding the safety threshold. The system automatically cuts power after 0.5s.
Process Operate
Run the Cash Flow
EVsafe doesn't just install. We set up the system to
turn a “dead” parking lot into an automatically profit-generating asset right from day one.
View the detailed operating process
1
Assessment & Infrastructure
Measure spare load, wire to IEC standard
2
IoT & Operation
System online, automatic fee collection
3
Monitoring & Maintenance
24/7 lifetime support
POLICY: NO SELLING OF LOOSE EQUIPMENT
High-power electrical safety depends largely on construction
correct and continuous monitoring.
EVsafe refuses to sell hardware for customers to self-install (DIY), to eliminate fire and explosion risk for the commu-
-nity.
* Goal: deploy to standard right from the start to avoid “tearing down and redoing.”
Electric motorbike charging (AC 220V)
An essential need at mini apartment buildings & rental housing. EVsafe focuses on
planning separate zones + load management + automatic fee collection
to completely eliminate the “wire-tapping” problem that causes fire & explosion.
1.2kW
Standard charging
- Suitable for most motorbikes
electric
- Load management
per line
2.2kW
220V fast charging
- Optimized for residential areas
crowded
- Mandatory
with a dedicated RCBO
IoTHub
Centralized management
- Cut power when the charger is unplugged
- App revenue report
AC car charging (7 / 11 / 22 kW)
Suitable for long-duration parking (offices, apartment buildings). The key is
3-phase power and technology
Load balancing (Load balancing) so the building's power supply doesn't fail.
Phase • 220V
Household
- 32A Maximum current
- Suitable: 1-2 vehicles
Optimal choice
Phase • 380V
Office / Building
- 16A x 3 Phase balancing
- Suitable for: large-scale deployment
Phase • 380V
Premium service
- 32A x 3 Max speed
- Requires large electrical infrastructure
DC fast charging (30 - 240 kW)
For short stops (rest stops, cafes, malls). Requires
an extremely large power supply and flow planning
of vehicles, precisely.
Café / Small lot
Shophouse
Traffic corridor
Service station
MAX
Large charging hub
Want to know which charger type suits you?
EVsafe surveys the load + vehicle flow + budget to finalize the optimal config
optimal.
Infrastructure Decides Safe
Complete
EVsafe only deploys when the site meets minimum conditions. If lacking, we will advise on a plan
renovate or decline installation to ensure safety.
Electric motorbike
- Stable 220V power
, separate dedicated line.
- Covered area
covered, dry.
-
Don't tap into the shared household socket.
AC Car (7-22kW)
- 3-phase power (with
station >7kW).
- Standard-compliant grounding
(< 10 Ohm).
-
Building spare load > 20%.
DC Fast Charging
- Dedicated transformer station
/ high power.
- Fire safety & Approval
design.
-
Site sufficient for vehicles entering and exiting.
Quick Questions, Concise Answers
How much is the investment cost for one charging station?
Cost depends on the power capacity (AC/DC) and the current state of the wiring. EVsafe offers flexible
packages from basic to premium. You can see the details on the page
How do you ensure fire and explosion safety for the building?
We apply a 3-layer process: leakage protection device (RCBO) + temperature sensor + system
remote automatic cutoff. Learn more about
Safety & operational responsibility
operation.
Does EVsafe charge a monthly operating fee?
Yes. The operating fee includes software maintenance, IoT servers, and revenue reconciliation. However, we
we commit to a win-win profit-sharing model. Learn more at
EVsafe charging.
How do I register for a survey?
Very simple. You just fill in the registration form. The technical team will contact you within 2h
business.