Installing Electric Vehicle Charging Stations in District 5: A Solution for Homes, Businesses, and Hospitals in Chợ Lớn

17/08/2026

District 5 - the bustling center of Chợ Lớn with a high density of commercial houses and a large number of people visiting hospitals every day. See the EVsafe electric vehicle charging station solution for each type of premises and how revenue is shared with homeowners.

EVsafe Electric Vehicle Charging Station at a convenience store in a crowded shopping area

District 5 is the center of Chợ Lớn - one of the busiest commercial areas in TP.HCM with an extremely high density of commercial houses, plus a large number of people visiting major hospitals and medical schools every day. This is an ideal environment for electric vehicle charging stations to play their role: serving both local businesses and transient customers.

If you own a commercial house, a parking lot, or a premises near a market/hospital in District 5, this article will help you understand the characteristics of the area, the suitable charging station solution, and the revenue-sharing model when cooperating with EVsafe.

Administrative note: According to the administrative arrangement for 2025-2026, TP.HCM has abolished the district/county level. The term "District 5" in this article is used according to the old administrative name (before 1/7/2025) for easy searching and positioning according to habits, not the current administrative unit name.

Characteristics of District 5 Area

District 5 is closely associated with Chợ Lớn - the traditional commercial area of the Chinese community in Ho Chi Minh City, notable for its Eastern medicine street Hải Thượng Lãn Ông, Bình Tây Market, An Đông Plaza shopping center, and thousands of street-front houses doing business on major streets like Trần Hưng Đạo, Nguyễn Trãi, and An Dương Vương. The density of small-scale households - from pharmacies, restaurants, mini hotels to wholesale stores - is among the highest in the city.

In addition, District 5 is also home to major medical facilities like Chợ Rẫy Hospital and medical training institutions, resulting in a large number of people, including patients' relatives and medical students, coming and going every day - the demand for parking and charging electric motorcycles in this area is always high. Housing in District 5 is mainly old street-front houses, with fewer new high-rise apartments compared to other districts, so most of the charging demand is associated with business premises and parking lots rather than apartments.

Demand for electric motorcycle charging in District 5

  • Street-front households: owners of shops and wholesale employees at Chợ Lớn need charging spots right on the premises while doing business all day, but the household electrical outlets in old street-front houses often lack sufficient power capacity and are not safe for long-term charging.
  • Parking lots near markets/hospitals: the large number of vehicles coming and going every day around Chợ Rẫy Hospital, Bình Tây Market, and An Đông Plaza - creates a demand for fast charging while parking by the hour or by the day.
  • Houses with rental rooms: many houses in District 5 combine business on the ground floor with rental rooms on the upper floors, creating an additional group of people in need of charging services.

The characteristic of old street-front houses, high business density, and aging electrical infrastructure makes the installation of dedicated, fire-safe charging stations a pressing need rather than just an option.

Apartment parking lots have a separate area for electric motorcycle charging

EVsafe solution by type of premises in District 5

Quick summary table by common type of premises in District 5:

Loại mặt bằngGiải pháp EVsafeDoanh thu ước tính/tháng/trụ (minh hoạ)
Nhà phố kinh doanh, mặt tiền Chợ LớnTrụ 4-10 cổng, lắp trước cửa hàng~1,2 - 3 triệu đồng
Bãi giữ xe khu chợ/bệnh việnTrụ 10 cổng, lưu lượng cao~2,7 - 3 triệu đồng
Nhà phố có phòng cho thuêTrụ 4-10 cổng, khu để xe chung~1,2 - 3 triệu đồng

*(Illustrative figures are based on the assumption of 1 station with 10 ports, charging price ~4,000đ/turn, ~25 turns/day → gross revenue ~3 million đồng/month/station. Actual figures depend on location, traffic, and will be specifically surveyed.)*

Revenue-sharing model for premises owners

EVsafe cooperates to share revenue in real-time, with transparent reconciliation via the app on the 15th and 30th of each month - without having to rent premises at a fixed price:

  • Premises owner invests in equipment: invests in installing the station, receives 90% of revenue, EVsafe keeps 10%.
  • EVsafe invests entirely: no need to invest capital, receives 40% of revenue, EVsafe keeps 60%.

For homeowners doing business in District 5 - a group that usually has a steady cash flow from business activities - the self-investment model helps maximize the share and quickly recoup capital thanks to the stable flow of customers around the market. For car park owners or homeowners who do not want to invest initial capital, the EVsafe investment model is a safe choice to have a charging infrastructure without incurring costs.

EVsafe technicians install an electric motorcycle charging station in a parking area

EVsafe station/project near District 5

EVsafe is expanding its charging station network in the central area of Ho Chi Minh City, including District 5. Register for a survey now to be prioritized in the next deployment phase and receive a specific quote according to your premises.

Frequently asked questions

Can a business house in Chợ Lớn install a charging station?

Yes. EVsafe surveys the facade and actual electrical load to propose a suitable configuration, even for small-sized business houses characteristic of the Chợ Lớn area.

How long does it take to install a charging station in District 5?

Usually 5-10 working days from survey to when the charging pole is operational, depending on the level of renovation needed for the existing electrical infrastructure (old houses may require a more thorough survey).

Is single-phase electricity enough to install a charging station?

Yes. Most houses in District 5 use single-phase electricity, and EVsafe will survey and propose a corresponding pole configuration.

Is the charging station safe for fire prevention in a densely populated residential area?

Yes. The equipment and installation records comply with current fire prevention regulations, accompanied by civil liability insurance - suitable for the characteristic of adjacent houses and high density of the Chợ Lớn area.

Do you have a house, car park, or premises in District 5 and want to know the actual income from a charging station? Register for a free survey with EVsafe - the technician will measure the electrical load, provide fire prevention and fighting advice, and send a detailed revenue and expenditure estimate.

News blog

Latest news

View all news

Become a partner with EVsafe

No installation cost, and a stable income stream with profits of up to 30 million VND per month.

Become a partner today